PJ2T Progressive Maintenance Plan and Log

ccc_small1.gif (6461 bytes) sunrise.jpg (17190 bytes)

Dawn at PJ2T, October, 2001


 

Item Explanation When Needed When Accomplished Notes
Paint US/JA tower with two-component paint Use marine paint from Antillean paint factory in Willemstad. (It's $80/gallon.) Now, then very year in December. 100% complete Jan 2003, Dec 2004. February 2005. July 2006. 
Paint Europe tower with two-component paint Use marine paint from Antillean paint factory in Willemstad Now, then very year in December. 100 % complete March 2003, Dec 2004. December 2005.
Inspect and repair weak legs and zig-zags on WARC tower Aluminum tower is 30 years old and has corrosion damage in places 2003, then as needed February 2006 New rotor plate U-bolts needed
Inspect all yagis with binoculars and take down and re-hab as needed Pipe straps will corrode. As needed July 2006
Replace coax feedlines to yagis Each yagi should be done once every five years or as needed based on wattmeter measurements As needed Pending
Measure power at stations and at antenna for each antenna and record baseline readings This is the best way to identify feedline deterioration US/JA tower 2004; Europe tower 2005;
WARC tower 2006;
Wire antennas 2003
Pending
Inspect and re-coat cable waterproof connections Scotchkote wears off in salt and wind As needed Pending
Check and adjust guy wire tension Phillystran may stretch over time; concrete settles Biannually: 2002, 2004, 2006, 2008 Pending
Remove weatherproofing and inspect guy grips on both ends of all EHS guy wire tails Corrosion Annually Pending
Inspect and re-tension boom wind guys Stretching Annually Nov 02
February 2006
Inspect and re-secure Beverage terminations Vandals and animals may damage these Three times each year US/JA: November 2001
US/JA: November 2002
US/JA: Jan 2003
Europe: July 2003, Europe October 2004. February 2006.
Check and replace cable tape and tiewraps on towers and messenger line Deterioriate in the weather and ultraviolet Annually July 2004 September 2005
Replace Heil muffs Rot quickly in the heat As needed Done, October 2004 AE9B donated spare (large) set to W0CG and shipped them to his QTH in Jan 02.
Clean all keying paddles Light corrosion layer builds in only a couple of days As needed Done, February 2006
Open, inspect, clean all linears Clean contacts and remove bugs Biannually: 2003, 2005, 2007, 2009 AL-1200: Nov 2001
LK-800: Nov 2001
AL-1200: Nov 02
LK-800: Nov 02
Titan II: Nov 02
Centaur: Nov 02
K8NZ: Nov 02
Alpha 76: Nov 02
Open and inspect Inv L unum box and re-hab as needed Weather deterioration Biannually: 2003, 2005, 2007, 2009 October 2004
Clean coils on HF-2V Salt Annually Pending
Coat all threaded fittings with Anti Sieze Salt Annually February 2002 - N8LGP, July 2004 by Cindy, February 2006 (N8LGP)