Interim Rohn Cost Estimate (January 2001)

100 foot tower

3 Rohn 45G tower sections (the other 7 sections are being donated by N8NR!) Click here for photo from N8NR's pole building.

$179 (Texas Towers) $537
100 foot tower 45G flat top $0 (donated by N8NR) $0
100 foot tower AS455G rotor shelf  Click here for photo. $0 - (donated by N8NR) $0

 

100 foot tower 3 GA45G guy bracket assemblies $0 (donated by N8NR) $0
100 foot tower BPC45G flat concrete base plate $0 (donated by N8NR) $0
100 foot tower 2 inch thrust bearing and galvanized bolts W8AV will procure $0
100 foot tower Phillystran guy wire and 18 deadends Already have $0
100 foot tower 9 403 insulators to transition from Phillystran to steel guys, about 15 feet off the ground W8AV and W0CG will supply $0
100 foot tower 108 feet 1/4 inch EHS guy wire N8NR will supply $0
100 foot tower 9 1/2 inch x 12 inch turnbuckles $17 (Texas Towers) $153
100 foot tower EP25343 three-hole galvanized equalizer plates plus galvanized hardware W0CG will supply $0
100 foot tower GAR30 3 concrete guy anchor rods $35 (Texas Towers) $105
100 foot tower Excavation of four base holes Estimated $100 each $400
100 foot tower 3 cubic meters concrete $95 each (estimated) $285
TOTAL     $1480
80 foot tower Tower sections W8AV will supply $0
80 foot tower 2 inch thrust bearing and galvanized bolts W8AV will supply $0
80 foot tower Phillystran guy wire and 18 deadends Already have $0
80 foot tower 6 403 insulators to transition from Phillystran to steel guys, about 15 feet off the ground W8AV and W0CG will supply $0
80 foot tower 108 feet 1/4 inch EHS guy wire N8NR will supply $0
80 foot tower 6 1/2 inch x 12 inch turnbuckles $17 (Texas Towers) $153
80 foot tower EP25343 three-hole galvanized equalizer plates plus galvanized hardware $22 $66
80 foot tower GAR30 3 concrete guy anchor rods $35 (Texas Towers) $105
80 foot tower Excavation of four base holes Estimated $100 each $400
80 foot tower 3 cubic meters concrete $95 each (estimated) $285
       
GRAND TOTAL     $2489